This site uses cookies to improve your experience and optimize your experience. By continuing to use this site, you agree to our use of cookies on this site. Read more
Back

Details:

  • Client:

    SIA „Homeland Būve”

  • Period:

    2017 - 2018

  • Place:

    11.novembra krastmalā 33

  • Task:

    Building engineering systems

  • The implemented solutions:

    Water supply; heating; ventilation; conditioning; data network; video surveillance; UAS; BMS; DNA; power supply

Description:

On November, 2018 in Old Riga there was put into service a newly constructed four star increased comfort hotel “Wellton Riverside Spa Hotel”, in a process of creation of which we have participated starting from designing stage.

One of the most main advantages is the location of the hotel –  11.novembra krastmala 33, where the hotel guests have a possibility to enjoy a wonderful view to four bridges over the river Daugava (Vanšu bridge, Akmens bridge. Salu bridge, Railway bridge). Near the hotel there are historical and remarkable sightseeing, as well as leisure and business centres. Wellton Riverside SPA Hotel is a four star Superior category hotel, in eight floors of which there are located 222 increased comfort rooms, which are equipped with all the necessary for comfortable overnight stay in heart of Riga City. In the building there are located SPA complex, restaurant, as well as activity and conference room. On the basement floor of the hotel there is located a SPA complex with an area of 638 square meters, which in terms of area and offered services is considered as the largest in Old Riga.

We were in charge of assembly of the hotel most essential engineering systems. This is the first project, where we built water and sewerage systems. In total there were built 16 systems:

  • Water supply
  • Household sewerage
  • Fire extinguishing water pipeline
  • Rainwater sewerage
  • Production sewerage
  • Heating
  • Ventilation
  • Air conditioning
  • Data network (ESS)
  • Video surveillance (CCTV)
  • Fire extinguishing automation system (UAS)
  • Building management system (BMS)
  • Smoke extraction automation (DNA)
  • Water pipeline valve automation (UAA)
  • Power supply
  • Audio system

As it is appropriate for the highest class hotel, in or work we also used the highest class technologies from our cooperation partners. We are satisfied with performed and proud that we have participated in the improvement of the city infrastructure. This project is also a great example that our employees are ready to undertake challenges – to administrate construction works of new networks, which expand their field of knowledge and experience!