This site uses cookies to improve your experience and optimize your experience. By continuing to use this site, you agree to our use of cookies on this site. Read more
Back

Details:

  • Client:

    Zweckverband Breitband Landkreis Schwäbisch Hall

  • Period:

    05/2022 - 06/2024

  • Place:

    Kirchberg an der Jagst, Baden-Württemberg, Germany

  • Task:

    Construction of a fiber optic cable network

Description:

Construction of an optical network from scratch: laying of pipes, construction of an optical cable network, laying and blowing of cables, optical assembly and measurement, control panel/access point (POP) delivery, installation, installation of power supply, electrical equipment and passive optical equipment, installation and assembly of optical network distribution cabinets, construction of building entrances.

  • Total length of opical path: 37,7 km
  • Building inputs: 330

Construction supervision and design: GEO DATA GmbH