Details:

  • Client:

    SJSC “State Real Estate”, Latvia

  • Period:

    03/2022 - 06/2024

  • Place:

    Border of the Republic of Latvia – Republic of Belarus

  • Task:

    Design & Build

Description:

Full cycle design and construction (D&B) works:  construction of external land border of the Republic of Latvia – Republic of Belarus in nine priority stages.

Within the project the following will be constructed: high security fence, roads, patrol trails, patrol boardwalks, pontoons, tunnel at a railway crossing.

The total length of nine stages is 83 km.

The construction design solutions will be adapted to each particular territory and actual natural conditions – swamps, scarps, flooded areas, lake crossings.