Details:

  • Client:

    GasLINE GmbH & Co. KG

  • Period:

    11/2021 - 12/2027

  • Place:

    throughout the territory of Germany

Description:

  • Full-cycle D&B works on 5G connections: network design, material supply, construction works throughout the territory of Germany. Estimated project volumes: 5G connection network length: ~100 km, connections to antennas and towers: ~ 420).
  • D&B works on backbone networks for 5G needs. Estimated project volumes: backbone network length: ~360 km;

The umbrella agreement provides for conclusion of separate contracts for the implementation of specific projects.

Currently, 7 service contracts have already been concluded:

Service contracts for the construction of 5G connection:

  • Burlafingen-Freihalden (total length of the track: 1 km; timeframe for its implementation: 08/2022-11/2022)
  • Erzgebirge  (total length of the track: 3 km; timeframe for its implementation: 08/2022-10/2022)            
  • Nordbayern  (total length of the track: 5 km; timeframe for its implementation: 08/2022-12/2022)             
  • Sternenfels-Eichelberg (total length of the track: 4 km; timeframe for its implementation: 09/2022-12/2022)
  • Rostock-Neubrandenburg (total length of the track: 4 km; timeframe for its implementation: 07/2022-10/2022)

Construction of backbone networks for 5G needs:

  • Diefenbach-Hoheneck  (total length of the track: 33 km; timeframe for its implementation: 06/2022-04/2023)
  • Fischbachtal-Rodgau  (total length of the track: 33 km; timeframe for its implementation: 10/2022-08/2023)

 

We are greatly satisfied that by implementing the works within these projects, we contribute to the development of technological processes and fulfil the company’s mission “We change the world!”