  • Client:

    Westenergie AG (previously Innogy AG)

  • Period:

    2019 - 2021

  • Place:

    The territory of the Association of Municipalities of Angeln, Germany

Description:

Construction of an optical network from scratch: laying of pipes, construction of an optical cable network, laying and blowing of cables, optical assembly and measurement, control panel/access point (POP) delivery, installation, installation of power supply, electrical equipment and passive optical equipment, installation and assembly of optical network distribution cabinets, construction of building entrances.

  • Total length of excavation trenches: more than 300 km
  • The total length of the pipes – more than 700 km
  • Building inputs − for 3686 buildings
  • Optical cables – about 1830 km
  • Cabinets – 232
  • Central POPs – 4

 End customer: BZV Angeln (Schleswig-Holstein, Germany, Angeln Association of Municipalities: Husby, Hürup, Freienwill, Steinbergkirche, Steiberg, Maasbüll and others, a total of about 30 municipalities)