Details:

  • Client:

    SIA Tet

  • Period:

    2020 - 2021

  • Place:

    Kleistu 5, Riga, Latvia

  • Task:

    data centre design and construction in accordance with ANSI, NE 1047-1 and 1047-2 guidelines, as well as TIERIII infrastructure requirements

  • The implemented solutions:

    design, architecture and civil engineering, server room structures and cabinets, optical input, fire extinguishing, video surveillance system, public announcement system, burglar alarm, building management system, data network, air conditioning and refrigeration, gas extinguishing, access control system, average electricity voltage.

Description:

Data centre  “Kleistu” is suitable for deploying critical IT systems for business customers. The data centre is specialized for companies whose business is related to the processing and storage of financial transactions in accordance with the requirements of VISA/MasterCard Level 1.

Kleistu Data Centre of the Tet has been designed and built in accordance with ANSI, NE 1047-1 and 1047-2 guidelines, as well as TIERIII infrastructure requirements. The data centre is located on the infrastructure node of the Tet core network, which allows to provide reserved direct connections to the largest Internet exchange points in Europe and Russia.

Parameters of the data centre Kleistu:

  • Capacity – 122 racks
  • Process and personnel security standards: ISO 27001 certificate
  • Data centre availability: 99.75%

The project was managed in accordance with the project management standards developed by the Project Management Institute.

This is the second data centre of the company SIA “Tet”, for which the design and construction was performed by SIA “Citrus Solutions” as the general contractor.